Decision details

Slough Mass Rapid Transit Detailed Design and Consultation Update

Decision Maker: Cabinet

Decision status: For Determination

Is Key decision?: Yes

Is subject to call in?: No

Purpose:

To consider the detailed designs for the Slough Mass Rapid Transit (SMaRT) scheme, and receive an overview of the feedback received at the Mass Rapid Transit public consultations.

Decision:

That the progress made on the project, as set out below, be noted:

 

(a)  That the detailed designs for the SMaRT scheme are currently underway.

(b)  That a public consultation into the SMaRT scheme has been completed.

(c)  That the results of the public consultation into the SMaRT scheme are as outlined in Section 5 of the report.

(d)  That the consultation results are accepted and that the designs are amended to reflect the points raised during the consultation.

(e)  That the conclusions of this Cabinet meeting are accepted and shall be implemented in line with the Council’s procurement policy.

Report author: Savio DeCruz

Publication date: 09/01/2015

Date of decision: 19/01/2015

Decided at meeting: 19/01/2015 - Cabinet