Agenda item

Highway Changes in Chalvey

Decision:

(a)  That Officers draw up a number of options for measures to improve traffic flow and safety for pedestrians and road users in Chalvey.

(b)  That an experimental consultation exercise be held with road users and residents affected by changes outlined in (a) so that public support can be gauged and the scheme amended as appropriate.

(c)  That the scope of consultation be delegated to the Head of Transport in consultation with the Commissioner for Neighbourhoods & Renewal.

(d)  That options for the implementation of a scheme be reported to Cabinet at its next meeting.

(e)  That expenditure of up to £40k is agreed from the available capital allocation within the Chalvey regeneration project.

 

Minutes:

The Cabinet considered a report which sought approval to carry out a consultation of Chalvey residents and affected road users to gauge support for a range of measures to ease traffic flow and reduce congestion in this area of the town. It was noted that there was an expansive consultation carried out last year with Chalvey residents in which traffic problems was raised as a major issue. The outcomes of the consultation would be reported back to Cabinet at the next meeting. A Commissioner asked what the timeframe was for carrying out highway improvements. It was noted that this would need to be looked at once the consultation had been completed.

 

Resolved:-

 

(a)  That Officers draw up a number of options for measures to improve traffic flow and safety for pedestrians and road users in Chalvey.

(b)  That an experimental consultation exercise be held with road users and residents affected by changes outlined in (a) so that public support can be gauged and the scheme amended as appropriate.

(c)  That the scope of consultation be delegated to the Head of Transport in consultation with the Commissioner for Neighbourhoods & Renewal.

(d)  That options for the implementation of a scheme be reported to Cabinet at its next meeting.

(e)  That expenditure of up to £40k is agreed from the available capital allocation within the Chalvey regeneration project.

 

Supporting documents: