Britwell Regeneration Scheme - From Concept to Reality

Decision:

 

(a)  That the progress reported at Appendix B be noted.

 

(b)  That the appointment of Thomas Sinden Ltd to construct the Britwell Community Hub and that work is due to commence by the end of February 2012 be noted.

 

(c)  That the interim Assistant Director Environment and Regeneration report back to Cabinet in March 2012 to seek the appointment of the preferred Developer for sites 2A and 2B  of the Britwell Regeneration Scheme contract.

 

(d)  That the house building contractor for the Jolly Londoner and Old Britwell Library / Car Sales Satellite Housing Sites be appointed as recommended in the report in Part II of the Agenda;

 

(e)  That the interim Assistant Director Environment & Regeneration be authorised to appoint the house building contractor for the Newbeech Satellite Housing Site following consultation with the Commissioner for Neighbourhoods & Renewal;

 

(f)  That the progress being made with relocating shops from beneath Wentworth Flats and to relocate the Scouts & Guides on Kennedy Park be noted;

 

(g)  That a further progress report be made to the next meeting.

 

 

Minutes:

The Cabinet considered an update report on the progress on the delivery of Britwell Regeneration Scheme.  The report also sought Cabinet approval to agree to appoint the design and build contractor as set out in the Part II report for two satellite sites.  

 

In introducing the report the Interim Assistant Director of Environment and Regeneration requested, and it was agreed, that recommendations with regard to the contractor to be appointed for the Britwell Regeneration Housing contract be reported to the March Cabinet meeting.

 

The Cabinet noted that a Part II report had been circulated on this item and agreed to take the item in Part I with no reference to the detailed Part II information being  divulged. 

 

Resolved -

 

(a)  That the progress reported at Appendix B be noted.

 

(b)  That the appointment of Thomas Sinden Ltd to construct the Britwell Community Hub and that work is due to commence by the end of February 2012 be noted.

 

(c)  That the interim Assistant Director Environment and Regeneration report back to Cabinet in March 2012 to seek the appointment of the preferred Developer for sites 2A and 2B  of the Britwell Regeneration Scheme contract.

 

(d)  That the house building contractor for the Jolly Londoner and Old Britwell Library / Car Sales Satellite Housing Sites be appointed as recommended in the report in Part II of the Agenda.

 

(e)  That the interim Assistant Director Environment & Regeneration be authorised to appoint the house building contractor for the Newbeech Satellite Housing Site following consultation with the Commissioner for Neighbourhoods & Renewal.

 

(f)  That the progress being made with relocating shops from beneath Wentworth Flats and to relocate the Scouts & Guides on Kennedy Park be noted.

 

(g)  That a further progress report be made to the next meeting.